Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost
نویسندگان
چکیده
We study Pareto-scheduling on an unbounded parallel-batch machine that can process any number of jobs simultaneously in a batch. The processing time batch is equal to the maximum consider two problems. In one problem, are partitioned into families and from different cannot be processed together same assume constant. objective minimize makespan cost. other we have agents A B, where each agent $$E\in \{A,B\}$$ has its job set $${{\mathcal {J}}}_{E}$$ , called E-jobs. Assuming sets {J}}}_{A}$$ {J}}}_{B}$$ not necessarily disjoint, call $$\text {ND}$$ agents. A-jobs cost B-jobs. provide polynomial-time algorithms solve
منابع مشابه
Scheduling parallel jobs to minimize the makespan
We consider the NP-hard problem of scheduling parallel jobs with release dates on identical parallel machines to minimize the makespan. A parallel job requires simultaneously a prespecified, job-dependent number of machines when being processed. We prove that the makespan of any nonpreemptive list-schedule is within a factor of 2 of the optimal preemptive makespan. This gives the best-known app...
متن کاملThe unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
In this paper we consider the unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan. We show that this problem is strongly NP-hard, and give an O p n p n m + 1 Q m Q time dynamic programming algorithm and an O(mk k+1 P 2k−1) time dynamic programming algorithm, where n is the number of jobs, m is the number of families, k is the number...
متن کاملUnbounded parallel batch scheduling with job delivery to minimize makespan
We consider unbounded parallel batch scheduling with job delivery to minimize makespan. When the jobs have identical size, we provide a polynomial-time algorithm. When the jobs have non-identical sizes, we provide a heuristic with a worst-case performance ratio 7/4. c © 2008 Published by Elsevier B.V.
متن کاملThe unbounded parallel batch machine scheduling with release dates and rejection to minimize makespan
In this paper, we consider the unbounded parallel batch machine scheduling with release dates and rejection. A job is either rejected with a certain penalty having to be paid, or accepted and processed in batches on the parallel batch machine. The processing time of a batch is defined as the longest processing time of the jobs contained in it. The objective is to minimize the sum of the makespa...
متن کاملScheduling Jobs with Stochastic Processing Requirements on Parallel Machines to Minimize Makespan or Flowtime
A number of identical machines operating in parallel are to be used to complete the processing of a collection of jobs so as to minimize either the jobs' makespan or flowtime. The total processing required to complete each job has the same probability distribution, but some jobs may have received differing amounts of processing prior to the start. When the distribution has a monotone hazard rat...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: 4OR
سال: 2021
ISSN: ['1614-2411', '1619-4500']
DOI: https://doi.org/10.1007/s10288-021-00480-3