Parallel-machine scheduling with non-simultaneous machine available time

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

Parallel Machine Scheduling Problem

A new constructive heuristic for the scheduling problem of n independent jobs on m identical parallel machines with minimum makespan objective is described. The proposed algorithm, which is an n logn algorithm as the LPT algorithm of Graham, iteratively combines partial solutions that are obtained by partitioning the set of jobs in suitable families of subsets. The algorithm was tested using di...

متن کامل

Parallel Machine Batch Scheduling

The problem of scheduling G groups of jobs on m unrelated parallel machines is considered. Each group consists of several identical jobs. Implicit in a schedule is a partition of a group into batches; all jobs of a batch are processed jointly. It is possible for diierent batches of the same group to be processed concurrently on diierent machines. However, at any time, a batch can be processed o...

متن کامل

Approximation schemes for parallel machine scheduling with non-renewable resources

In this paper the approximability of parallel machine scheduling problems with resource consuming jobs is studied. In these problems, in addition to a parallel machine environment, there are non-renewable resources, like raw materials, energy, or money, consumed by the jobs. Each resource has an initial stock, and some additional supplies at a-priori known moments of times and in known quantiti...

متن کامل

A GRASP for Parallel Machine Scheduling with Time Windows

T paper presents a greedy randomized adaptive search procedure (GRASP) for scheduling n jobs on m nonhomogeneous parallel machines with time windows. An additional feature of the problem is that each job falls into one of priority classes. The objective is to maximize the number of jobs scheduled, where a job in a higher priority class has infinitely more value than a job in a lower priority cl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Mathematical Modelling

سال: 2013

ISSN: 0307-904X

DOI: 10.1016/j.apm.2012.09.053