Parallel Machine Scheduling Problem with a Non-Regular Objective Function

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Parallel Machine Scheduling Problem

A new constructive heuristic for the scheduling problem of n independent jobs on m identical parallel machines with minimum makespan objective is described. The proposed algorithm, which is an n logn algorithm as the LPT algorithm of Graham, iteratively combines partial solutions that are obtained by partitioning the set of jobs in suitable families of subsets. The algorithm was tested using di...

متن کامل

A composite heuristic for the identical parallel machine scheduling problem with minimum makespan objective

--This paper describes a new heuristic algorithm for the problem of scheduling )I independent jobs on m identical parallel machines in order to minimize the makespan. The algorithm produces near-optimal solutions in short computation times. It outperforms alternative heuristics on a series of test problems.

متن کامل

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...

متن کامل

A note on a single machine scheduling problem with generalized total tardiness objective function

In this note, we consider a single machine scheduling problem with generalized total tardiness objective function. A pseudo-polynomial time solution algorithm is proposed for a special case of this problem. Moreover, we present a new graphical algorithm for another special case, which corresponds to the classical problem of minimizing the weighted number of tardy jobs on a single machine. The l...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transactions of the Society of Instrument and Control Engineers

سال: 1999

ISSN: 0453-4654

DOI: 10.9746/sicetr1965.35.1176