Ore deposit selection using the combined TOPSIS and AHP method

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Selection by Using Fuzzy AHP and TOPSIS Technique

In this article, by using fuzzy AHP and TOPSIS technique we propose a new method for project selection problem. After reviewing four common methods of comparing alternatives investment (net present value, rate of return, benefit cost analysis and payback period) we use them as criteria in AHP tree. In this methodology by utilizing improved Analytical Hierarchy Process by Fuzzy set theory, first...

متن کامل

Supplier Selection Using a DEA-TOPSIS Method

  Supplier selection is one of the critical activities for firms to gain competitive advantage and achieve the objectives of the whole supply chain. In this paper based on a DEA-TOPSIS method for MADM problems a flexible strategy for supplier selection is introduced

متن کامل

Access Network Selection in a Heterogeneous Environment Using the AHP and Fuzzy TOPSIS Methods

The problem of network selection across heterogeneous wireless networks has recently received much attention because of a drive for converged communication systems. However, since the selection of an access network depends on several parameters with different relative importance, such as the network and the application characteristics, the user preferences, the service cost, etc, it is a diffic...

متن کامل

Multi-response optimization of WEDM Process Parameters using the AHP and TOPSIS method

The work presents a multi response optimization approach to determine the optimal process parameters in wire electrical discharge machining process. Experiments have been conducted using six process parameters such as discharge current, pulse duration, pulse frequency, wire speed, wire tension and dielectric flow rate each at three levels for obtaining the responses like material removal rate, ...

متن کامل

Selection of Concrete Production Facility Location Integrating Fuzzy AHP with TOPSIS Method

Evaluation and selection of a concrete production facility location is an important strategic decision making problems for both the public and private sector. The multi-dimensional, multi-criteria nature of the concrete production facility location problem limits the usefulness of any particular single objective model. In this study, social, economical, technological, environmental, and transpo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Rudarski radovi, Bor

سال: 2012

ISSN: 1451-0162

DOI: 10.5937/rudrad1203203p