Optimum workforce scheduling under the (14, 21) days-off timetable

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimum workforce scheduling under the (14, 21) days-off timetable

An efficient optimum solution is presented for a real-life employee daysoff scheduling problem with a three-week cycle. Over a given work cycle, each worker is given 14 successive workdays and 7 successive off days. This three-week days-off timetable is referred to as the (14, 21) schedule. Given different labor demands for each day of the week, the primary objective is to minimize the number o...

متن کامل

A Simulation Approach for Stochastic Employee Days-off Scheduling

This paper presents a simulation approach for employee days-off scheduling when the daily labour demands are random variables. A simulation model is constructed, and a case study application of the proposed approach is described. The model recognizes limited staff availability, stochastic workload variability, and policy restrictions on the choice of employee work schedules. The model has been ...

متن کامل

Nearly Optimum Timetable Construction Through CLP and Intelligent Search

The course timetable construction is a procedure that every academic department has to carry out at least twice annually, more times if some of the requirements change. These requirements indicate that a collection of elements must be taken in mind in order for an acceptable solution to be found. They come either from the inherent constraints of the problem or from the involved parties, namely ...

متن کامل

The Trade Off Between Diversity and Quality for Multi-objective Workforce Scheduling

In this paper we investigate and compare multi-objective and weighted single objective approaches to a real world workforce scheduling problem. For this difficult problem we consider the trade off in solution quality versus population diversity, for different sets of fixed objective weights. Our real-world workforce scheduling problem consists of assigning resources with the appropriate skills ...

متن کامل

Sclerostin and DKK1 levels during 14 and 21 days of bed rest in healthy young men.

OBJECTIVES Wnt signaling pathway may be crucial in the pathogenesis of disuse-induced bone loss. Sclerostin and DKK1, antagonists of the Wnt signaling pathway, were assessed during immobilization by bed rest in young, healthy people. METHODS Two bed rest studies were conducted at the German Aerospace Center in Cologne. 14 days of 6° head-down-tilt bed rest were applied to eight healthy young ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Applied Mathematics and Decision Sciences

سال: 2002

ISSN: 1173-9126

DOI: 10.1155/s1173912602000123