Optimum Value Operation in Waterhammer

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimum Operation of Split Rf Photoinjectors

We. describe how to achieve minimum transverse emittance in RF photoinjectors by applying theoretical predictions from a fully analytical model of beam dynamics in a split injector. This device consists of a short two cell (full+partial) RF gun followed by a drift and a booster RF linac. Matching the beam in the booster to the invariant envelope, an equilibrium mode of laminar beam flow, is sho...

متن کامل

A precursor in waterhammer analysis – rediscovering

In 1883 Johannes von Kries published the theory of waterhammer in a study of blood flow in arteries. He derived the “Joukowsky formula” before Joukowsky (1898) and Frizell (1898) did. He considered skin friction in unsteady laminar flow and thus derived formulas for wave attenuation and line pack. The theory was confirmed by experimental results obtained in rubber hoses. In 1892 he published th...

متن کامل

Optimum Operation Conditions of Direct Capillary Nanofiltration for Wastewater Treatment

Direct Capillary Nanofiltration (Direct CNF) is a new technique used for surface water and wastewater treatment in one step without pre-treatment. The CNF membrane module combines the favourable cleaning properties of capillary ultrafiltration membranes with the favourable separation properties of nanofiltration membranes in terms of removal of DOC, colour, bacteria, viruses and pesticides. Dir...

متن کامل

Optimum conditions for preparative operation of capillary zone electrophoresis

The possibilities to use capillary zone electrophoresis (CZE) as a preparative tool have been studied, mostly from a theoretical point of view. The preparative performance of CZE is quantitated by the production rate, the amount of analyte that can be purified per unit of time. The production rate available with CZE is shown to depend in the first place on the chemical characteristics of the an...

متن کامل

Optimum Failure Finding Inspection During Extended Operation Life

In a complex system such as railway and aviation equipment’s, it may be necessary to employ a combination of Failure Finding Inspection (FFI) and a scheduled discard task, as suggested by Reliability-Centered Maintenance (RCM). This strategy ensures an adequate level of availability of hidden functions, as well as the reduction of the risk of multiple failures to an acceptable level. However, i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series B

سال: 1983

ISSN: 0387-5016,1884-8346

DOI: 10.1299/kikaib.49.2248