Optimizing the Low-Carbon Flexible Job Shop Scheduling Problem Considering Energy Consumption
نویسندگان
چکیده
منابع مشابه
Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times
This paper presents a novel method on the optimization of bi-objective Flexible Job-shop Scheduling Problem (FJSP) under stochastic processing times. The robust counterpart model and the Non-dominated Sorting Genetic Algorithm II (NSGA-II) are used to solve the bi-objective FJSP with consideration of the completion time and the total energy consumption under stochastic processing times. The cas...
متن کاملFlexible job shop scheduling under availability constraints
In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...
متن کاملFlexible Job-Shop Scheduling Problems
Planning and scheduling problems in various industrial environments are combinatorial and very difficult. Generally, it is extremely hard to solve these types of problems in their general form. Scheduling can be formulated as a problem of determining the best sequence to execute a set of tasks on a set of resources, respecting specific constraints like precedence or disjunctive constraints (Car...
متن کاملGenetic algorithm for the flexible job-shop scheduling problem
In this paper, we propose a new optimization technique, the hierarchical multi-space competitive distributed genetic algorithm (HmcDGA), which is effective for the hierarchical optimization problem. It is an extension of the multi-space competitive distributed genetic algorithm (mcDGA), which was proposed by the authors. The mcDGA efficiently finds an optimal solution with a low computational c...
متن کاملIterative Flattening Search for the Flexible Job Shop Scheduling Problem
This paper presents a meta-heuristic algorithm for solving the Flexible Job Shop Scheduling Problem (FJSSP). This strategy, known as Iterative Flattening Search (IFS), iteratively applies a relaxationstep, in which a subset of scheduling decisions are randomly retracted from the current solution; and a solving-step, in which a new solution is incrementally recomputed from this partial schedule....
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Access
سال: 2018
ISSN: 2169-3536
DOI: 10.1109/access.2018.2866133