Optimization Studies on the Changeable Components of Hydroelectric Power Plants

نویسندگان

چکیده

The design flow rate, the dimensions of transmission structure and penstock size have a large impact on cost run-of-river type hydroelectric power plants. Equipment costs constitute part total budget plant. Optimum sizing, which maximizes use hydraulic potential, does not fit together with optimum is necessary to obtain economic benefit from its investment. main parameters can be selected help an optimization study in terms both potential. In this study, easy implement model, aimed at determining associated different components structural organization plant, developed by feasibility overcome difficulties practice. Gokcekoy HEPP, built Turkey, was as system. Annual energy production values were calculated taking into account current market conditions Turkey. addition, real situation studies carried out regarding rate selection, forced pipe diameter channel sizing.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

STOCHASTIC MODELLING OF PUMP-STORAGE HYDROELECTRIC POWER PLANTS, Part II

In order to evaluate the reliability characteristics of the electricity generating systems which in addition to thermal plants with unlimited available energy includes also hydroelectric plants, beside the stochastic outages of generating units, the limitation of the – from stochastic inflows dependent – available amounts of primary energy (water) must be also taken into account. Therefore the ...

متن کامل

Model-Free Based Water Level Control for Hydroelectric Power Plants

Automatic water level control methods for open channels have difficulties to keep good performances for a large range of flow and significant unknown disturbances. A new concept called Model-Free Control is applied in this paper for hydroelectric run-of-the river power plants. To modulate power generation, a level trajectory is planned for cascaded power plants. Numerous dynamic simulations sho...

متن کامل

Experimental study of the effect of the trashrack on the vortex at the intake of the hydroelectric power plants in various flow rates and submergence depths

One of the main problems commonly encountered by the intakes of the power plants is the formation of vortex and turbulent flow at the intake of the reservoirs.Using the image processing method by using the PTV technique in a survey flow hydraulic of a horizontal intake with a trashrack by certain opening,under the submergence depths and different flow rates and comparing it with intakes without...

متن کامل

Deterministic optimization of short-term scheduling for hydroelectric power generation

This work focuses on the deterministic optimization of short-term scheduling for hydroelectric power generation. The proposed methodology builds on a detailed mathematical programming model by considering the topological, reservoir, and plant constraints, and by representing the hydro production by an accurate function. The formulation results in a non-convex MINLP problem. A deterministic opti...

متن کامل

analysis of power in the network society

اندیشمندان و صاحب نظران علوم اجتماعی بر این باورند که مرحله تازه ای در تاریخ جوامع بشری اغاز شده است. ویژگیهای این جامعه نو را می توان پدیده هایی از جمله اقتصاد اطلاعاتی جهانی ، هندسه متغیر شبکه ای، فرهنگ مجاز واقعی ، توسعه حیرت انگیز فناوری های دیجیتال، خدمات پیوسته و نیز فشردگی زمان و مکان برشمرد. از سوی دیگر قدرت به عنوان موضوع اصلی علم سیاست جایگاه مهمی در روابط انسانی دارد، قدرت و بازتولید...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: F?rat University Turkish journal of science & technology

سال: 2023

ISSN: ['1308-9080', '1308-9099']

DOI: https://doi.org/10.55525/tjst.1192089