Optimization of Signal Timing for the Contraflow Left-Turn Lane at Signalized Intersections Based on Delay Analysis

نویسندگان

چکیده

The exit-lanes for a left-turn (EFL) is an unconventional method of organizing traffic left-turns at signalized intersections. In this paper, we propose nonlinear optimization model to minimize delay by establishing delay-time diagram the when non-oversaturated, considering relationship between pre-signal start node and queuing dissipation time vehicles. Model validation performed with example calculations compare analyze each operating index fleet type after signal timing intersection lane borrowing lanes. results show that compared conventional lane, average vehicles decreased 15.7%, exhaust emission 11.4%, capacity increased 65.7%. can support EFL design, where control related queue time. practice, well-designed scheme based on volume improve reduce emissions while minimizing vehicle delays.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Developing an Analytical Model and Simulation of The Contraflow Left-Turn Lane at Signalized Intersections

At some intersections, excessive queue lengths may spill out of the left-turn bay and block the through lanes, jeopardizing level of service for the entire intersection. One of the most effective plans recently presented by the researchers is the "Contraflow left-turn lane" (CLL) In this method, left-turn vehicles will use the nearest lane in the opposite direction in addition to the usual left...

متن کامل

Delay Variability at Signalized Intersections

Delays that individual vehicles may experience at a signalized intersection are usually subject to large variation due to randomness of traffic arrivals and interruption caused by traffic signal control. While such variation may have important implications for the planning, design and analysis of signal controls, currently there is no analytical model available to quantify it. This paper descri...

متن کامل


 
 
 
 
 
 Increasing the Capacity of Signalized Intersections with Separate Left Turn

Separate turn phases are often used on the approach legs to intersections with heavy left turns. This wastes capacity on the approach because some of its lanes cannot discharge during its green phases. The paper shows that the problem can be eliminated by reorganizing traffic on all the lanes upstream of an intersection using a mid-block pre-signal. If drivers behave deterministically, the capa...

متن کامل

Safety Effects of Protected Left-Turn Phasing at Signalized Intersections: An Empirical Analysis

Left-turn crashes occur frequently at signalized intersections and often lead to severe injuries. This problem can be addressed through the implementation of protected left-turn signals. This gives left-turning vehicles the right to enter the intersection free from conflict with opposing drivers and pedestrians. The present study analyses the effect of this measure on crash occurrence. The stud...

متن کامل

Analysis of the Impact of user’s Violations on the Saturation Flow Rate at Signalized Intersections

Accurate estimation of saturation flow rate is a prerequisite for accurate estimation of level of service and delays of signalized intersections. Saturation flow rate of intersections depends on many factors, including traffic behavior and culture. One of the important problems of traffic behavior in Iran is the violation of law at the physical region of intersections. The main purpose of this ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2023

ISSN: ['2071-1050']

DOI: https://doi.org/10.3390/su15086477