Optimization of bi-objective permutation flow shop scheduling with electricity cost consideration

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling on flexible flow shop with cost-related objective function considering outsourcing options

This study considers outsourcing decisions in a flexible flow shop scheduling problem, in which each job can be processed by either an in-house production line or outsourced. The selected objective function aims to minimize the weighted sum of tardiness costs, in-house production costs, and outsourcing costs with respect to the jobs due date. The purpose of the problem is to select the jobs tha...

متن کامل

Bi-objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem

This paper considers a two-stage assembly flow shop problem (TAFSP) where m machines are in the first stage and an assembly machine is in the second stage. The objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. JIT seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...

متن کامل

Fuzzy Multi-objective Permutation Flow Shop Scheduling Problem with Fuzzy Processing Times under Learning and Aging Effects

In industries machine maintenance is used in order to avoid untimely machine fails as well as to improve production effectiveness. This research regards a permutation flow shop scheduling problem with aging and learning effects considering maintenance process. In this study, it is assumed that each machine may be subject to at most one maintenance activity during the planning horizon. The objec...

متن کامل

Tight Bounds for Permutation Flow Shop Scheduling

In flow shop scheduling there are m machines and n jobs, such that every job has to be processed on the machines in the fixed order 1, . . . , m. In the permutation flow shop problem, it is also required that each machine processes the set of all jobs in the same order. Formally, given n jobs along with their processing times on each machine, the goal is to compute a single permutation of the j...

متن کامل

A review and classification of heuristics for permutation flow-shop scheduling with makespan objective

Makespan minimisation in permutation flow shop scheduling is an OR topic that has been intensively addressed in the last 40 years. Since the problem is known to be NPcomplete for more than two machines, most of the research effort has been devoted to the development of heuristic procedures in order to provide good approximate solutions to the problem. However, little attention has been devoted ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Materials Science and Engineering

سال: 2020

ISSN: 1757-899X

DOI: 10.1088/1757-899x/909/1/012045