Optimization of Automobile Assembly Process to Reduce Assembly Time

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

OPTIMIZATION OF MULTIPLE PANEL FllTlNG IN AUTOMOBILE ASSEMBLY

A systematic approach is presented to obtain improved panel tit quality through the use of an optimum panel fitting strategy. ‘The objective of the optimal1 panel fitting strategy is to determine the location of the panels on the automobile body such that the gap and flush variation of the panel fit are mmimized. This approach uses measurement data from both the panels and the body-inwhite (BIW...

متن کامل

pulmonary adverse effects of welding fume in automobile assembly welders

welding is one of the key components of numerous manufacturing industries, which has potential physical and chemical health hazards. many components of welding fumes can potentially affect the lung function. this study investigates the effects of welding fumes on lung function and respiratory symptoms among welders of an automobile manufacturing plant in iran. this historical cohort study asses...

متن کامل

RFID-enabled real-time PBS monitoring for automobile assembly factory

Complete List of Authors: Huang, Gang; Huazhong University of Science & Technology, State Key Laboratory of Digital Manufacturing Equipment & Technology Li, Jinhang; Huazhong University of Science & Technology, Department of Industrial Engineering Yuan, Xiaodong; Huazhong University of Science & Technology, Department of Industrial Engineering Gao, Liang; Huazhong University of Science & Techno...

متن کامل

Bi-objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem

This paper considers a two-stage assembly flow shop problem (TAFSP) where m machines are in the first stage and an assembly machine is in the second stage. The objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. JIT seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...

متن کامل

Severe Weather and Automobile Assembly Productivity∗

It is apparent that severe weather should hamper the productivity of work that occurs outside. But what is the effect of extreme rain, snow, heat and wind on work that occurs indoors, such as the production of automobiles? Using weekly production data from 64 automobile plants in the United States over a ten-year period, we find that adverse weather conditions lead to a significant reduction in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computer-Aided Design and Applications

سال: 2014

ISSN: 1686-4360

DOI: 10.1080/16864360.2014.914410