Optimization Method for Container Quay Crane Operation Based on Energy Saving

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals

In this work, we focus on the integrated planning of the following problems faced within the context of seaside operations at container terminals: berth allocation, quay crane assignment, and quay crane scheduling. First, we formulate a new binary integer linear program for the integrated solution of the berth allocation and quay crane assignment problems called BACAP. Then we extend it by inco...

متن کامل

Quay Crane Allocation of Container Terminal Based on Cluster Analysis

Quay crane allocation is one of the most important scheduling plans in the container terminal. A large of production data is stored in the database of the terminal. This paper utilizes the method of data mining to analyze the problem of quay crane allocation by using these data. From the mining, valuable information has been gotten from the database. The paper chooses the fuzzy cmeans cluster a...

متن کامل

Skew control of a quay container crane

In this paper, the skew control of the load (container) in the quay crane used in the dockside of a container terminal is investigated. The mathematical model of the 3-dimensional (3D) motions of the load is first derived. The container hooked to a spreader is suspended by four ropes in air. When the container is accelerated by the trolley or is disturbed by winds, it will make a rotational mot...

متن کامل

Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption

Container terminals mainly include three types of handling equipment, i.e., quay cranes (QCs), internal trucks (ITs) and yard cranes (YCs). Due to high cost of the handling equipment, container terminals can hardly purchase additional handling equipment. Therefore, the reasonable scheduling of these handling equipment, especially coordinated scheduling of the three types of handling equipment, ...

متن کامل

Optimization of loading sequence and rehandling strategy for multi-quay crane operations in container terminals

In this paper, we consider the optimization of loading sequence and rehandling strategy in the terminal operation. We present an optimization strategy to minimize the number of rehandles, and establish a mathematical model to integrate the loading sequence and the rehandling strategy under the parallel operation of multi-quay cranes. Furthermore, we give an improved genetic algorithm to solve t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: E3S Web of Conferences

سال: 2018

ISSN: 2267-1242

DOI: 10.1051/e3sconf/20185301011