Optimisation of underground mine decline development system using genetic algorithm

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Constrained Path Optimisation for Underground Mine Layout

The major infrastructure component required to develop an underground mine is a decline, which is a system of tunnels used for access and haulage. In this paper we study the problem of designing a decline of minimum cost where cost is a combination of development and haulage costs over the life of the mine. A key design consideration is that the decline must be navigable to trucks and mining eq...

متن کامل

Optimisation of assembly scheduling in VCIM systems using genetic algorithm

Assembly plays an important role in any production system as it constitutes a significant portion of the lead time and cost of a product. Virtual computer-integrated manufacturing (VCIM) system is a modern production system being conceptually developed to extend the application of traditional computer-integrated manufacturing (CIM) system to global level. Assembly scheduling in VCIM systems is ...

متن کامل

Access Optimisation Tools in Underground Mine Design

Optimisation tools which determine the best layout for access and haulage in an underground mine address an important and difficult mine design problem. The complexity of the problem can be compared to the task of optimising the final pit design in an open pit, together with the pit haul roads required. The strategic design of an underground mine layout must address the location of haulage shaf...

متن کامل

Optimisation in the Design of Underground Mine Access

Efficient methods to model and optimise the design of open cut mines have been known for many years. The design of the infrastructure of underground mines has a similar potential for optimisation and strategic planning. Over the last five years our group has developed two pieces of software to tackle this problem – UNO (Underground Network Optimiser) and DOT (Decline Optimisation Tool). The ide...

متن کامل

Simulating Development in an Underground Hardrock Mine

System simulation is an increasingly popular technique for analyzing and improving existing as well as newly designed underground mining operations. An engineering firm that specializes in simulation helped a major metals producer build a long-range planning model of an existing underground mine. Subsequently the team adapted this model to assess technology alternatives in the design of a new m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Podzemni radovi

سال: 2014

ISSN: 0354-2904

DOI: 10.5937/podrad1425033g