Optimal total-work-content-power due-date determination and sequencing
نویسندگان
چکیده
منابع مشابه
Group sequencing around a common due date
The problem of scheduling groups of jobs on a single machine under the group technology assumption is studied. Jobs of the same group are processed contiguously and a sequence independent setup time precedes the processing of each group. All jobs have a common fixed due date, which can be either unrestrictively large or restrictively small. The objective is to minimize the total weighted earlin...
متن کاملAn Optimal NPV Project Scheduling with Fixed Work Content and Payment on Milestones
Project scheduling Net present value We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a t...
متن کاملWind Power Impacts on Electric Power System Operating Costs: Summary and Perspective on Work to Date
متن کامل
Hybrid Method for Optimal Power Flow Determination
Optimal Power Flow (OPF) is one of the main functions of Power Generation Operation and Control. It determines the optimal settings of generating units, bus voltage, transformer tap and shunt elements in Power System with the objective of minimizing total production costs or losses while the system is operating within its security limits. The aim of this paper is to propose a methodology (ABCA-...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Computers & Mathematics with Applications
سال: 1987
ISSN: 0898-1221
DOI: 10.1016/0898-1221(87)90184-2