Optimal timing of project control points
نویسندگان
چکیده
منابع مشابه
Optimal timing of project control points
The project control cycle consists of measuring the status of the project, comparing to the plan, analysis of the deviations, and implementing any appropriate corrective actions. We present an analytical framework for determining the optimal timing of project control points throughout the life cycle of the project. Our approach is based on maximizing the amount of information generated by the c...
متن کاملOn the Optimal Frequency and Timing of Control Points in a Project’s Life Cycle
The dynamic nature of projects and the fact that they are carried out in changing environments, justify the need for their periodic monitoring and control. Collection of information about the performance of projects at control points costs money. The corrective actions that may need to be taken to bring the project in line with the plan also costs money. On the other hand, penalties are usually...
متن کاملOptimal Integral State Feedback Control of HCCI Combustion Timing
Homogenous Charge Compression Ignition (HCCI) engines hold promise of high fuel efficiency and low emission levels for future green vehicles. But in contrast to gasoline and diesel engines, HCCI engines suffer from lack of having direct means to initiate combustion. A combustion timing controller with robust tracking performance is the key requirement to leverage HCCI application in production ...
متن کاملon the optimal frequency and timing of control points in a project’s life cycle
the dynamic nature of projects and the fact that they are carried out in changing environments, justify the need for their periodic monitoring and control. collection of information about the performance of projects at control points costs money. the corrective actions that may need to be taken to bring the project in line with the plan also costs money. on the other hand, penalties are usually...
متن کاملoptimal integral state feedback control of hcci combustion timing
homogenous charge compression ignition (hcci) engines hold promise of high fuel efficiency and low emission levels for future green vehicles. but in contrast to gasoline and diesel engines, hcci engines suffer from lack of having direct means to initiate combustion. a combustion timing controller with robust tracking performance is the key requirement to leverage hcci application in production ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European Journal of Operational Research
سال: 2000
ISSN: 0377-2217
DOI: 10.1016/s0377-2217(99)00492-0