Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs

This paper deals with a single-machine scheduling problem in which jobs are released in different points in time but delivered to customers in batches. A due window is associated with each job. The objective is to schedule the jobs, to form them into batches and to decide the delivery date of each batch so as to minimize the sum of earliness, tardiness, holding, and delivery costs. A mathematic...

متن کامل

JIT single machine scheduling problem with periodic preventive maintenance

This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...

متن کامل

Single Machine Scheduling with Distinct Due Dates under Fuzzy Environment

Single machine, distinct due dates, early/lately machine problem and fuzzy environment closely models the situation faced by ‘Just In Time’ manufacturing. The objective of this paper is to sequence the jobs on the machine, so that the total penalty cost be minimum. This cost is composed of the total earliness and the total tardiness cost. An algorithm is developed here to minimize the total pen...

متن کامل

Single-machine scheduling with waiting-time-dependent due dates

We consider a single-machine scheduling problem in which due dates are linear functions of the job waiting-times and the objective is to minimize the maximum lateness. An optimal sequence is constructed by implementing an index-based priority rule for a fixed value of the due date normalizing constant k. We determine in polynomial time all the k value ranges so that the optimal sequence remains...

متن کامل

Optimal Batch Production for a Single Machine System with Accumulated Defectives and Random Rate of Rework

In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Automation in Construction

سال: 2017

ISSN: 0926-5805

DOI: 10.1016/j.autcon.2017.03.016