Optimal Scheduling Of Generation Using ANFIS
نویسندگان
چکیده
منابع مشابه
Optimal Generation Scheduling of Hydro System Using Differential Evolution Algorithm
Hydro generation scheduling is a nonlinear programming problem. This paper describes the hydro generation scheduling problem constraints. The optimal hydro scheduling problem is formulated as a large scale linear programming algorithm and is solved using a commercially available linear programming package. The selected objective function requires minimization of demand and generation of a hydro...
متن کاملTwo-step optimal thermal generation scheduling
A new approach to the solution of the optimal thermal generation scheduling problem is presented. The problem is solved in two steps. As a first step, the optimal production schedule for the next day is obtained based on a daily load forecast, reserve capacity requirements, and present status of generating units. The second-step algorithm uses the results of the first step and adjusts the previ...
متن کاملOptimal Factory Scheduling using Stm
Generating optimal production schedules for manufacturing facilities is an area of great theoretical and practical importance. During the last decade, an effort has been made to reconcile the techniques developed by the AI and OR communities. The work described here aims to continue in this vein by showing how a class of well-defined stochastic scheduling problems can be mapped into a general s...
متن کاملStatic Security Constrained Generation Scheduling Using Sensitivity Characteristics of Neural Network
This paper proposes a novel approach for generation scheduling using sensitivitycharacteristic of a Security Analyzer Neural Network (SANN) for improving static securityof power system. In this paper, the potential overloading at the post contingency steadystateassociated with each line outage is proposed as a security index which is used forevaluation and enhancement of system static security....
متن کاملOptimal Generation Scheduling of Cascaded Hydroelectric System using Natural Exponential Inertia Weight PSO
Generation scheduling is a most important task in the operation and planning of power system. It can be on real term, short term, medium term, and long term basis as per the scheduled horizon. Scheduling of purely hydroelectric system differ from the thermal scheduling and hydrothermal scheduling problems in two aspects firstly fuel cost for the thermal part of the system can no longer be used ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Engineering Research and Applications
سال: 2017
ISSN: 2248-9622,2248-9622
DOI: 10.9790/9622-0707071115