Optimal sampling plan for clean development mechanism energy efficiency lighting projects

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal sampling plan for clean development mechanism lighting projects with lamp population decayI

This paper proposes a metering cost minimisation model that minimises sampling cost under the constraints of the required sampling accuracy of clean development mechanism (CDM) energy efficiency (EE) lighting project. Usually small scale (SSC) CDM EE lighting projects expect a crediting period of 10 years given that the lighting population will decay as time goes by. The SSC CDM sampling guidel...

متن کامل

Clean Development Mechanism

1. At its sixty-ninth meeting, the Executive Board (hereinafter referred to as the Board) of the clean development mechanism (CDM) considered the draft " Guidelines for determination of baseline and additionality thresholds for standardized baselines using the performance-penetration approach " (the guidelines) prepared by the secretariat. The Board provided comments and requested the secretari...

متن کامل

Clean Development meChanism

INtrODuCtION The Clean Development Mechanism has been recognized as a force for the empowerment of women through its various methodologies. While these methodologies may not have started out to be gender-friendly per se, their application has improved women's lives and by extension the lives of their communities. This publication will highlight some of these gender-friendly methodologies, as we...

متن کامل

Community Capacity for Implementing Clean Development Mechanism Projects Within Community Forests in Cameroon

There is a growing assumption that payments for environmental services including carbon sequestration and greenhouse gas emission reduction provide an opportunity for poverty reduction and the enhancement of sustainable development within integrated natural resource management approaches. Yet in experiential terms, community-based natural resource management implementation falls short of expect...

متن کامل

Clean Development Mechanism (cdm) Projects and the South African Mining Industry: Key Legal Issues for Consideration

The international legal foundation of the Clean Development Mechanism and the key requirements for successfully embarking on such projects are introduced. Potential opportunities for South African mining companies are highlighted. An explanation of national legal authorisation requirements will follow with reference to a hypothetical coal bed methane capture project as a case study. Issues such...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Energy

سال: 2013

ISSN: 0306-2619

DOI: 10.1016/j.apenergy.2013.05.064