Optimal Renewable Resource Allocation and Load Scheduling of Resilient Communities
نویسندگان
چکیده
منابع مشابه
Playing games against nature: optimal policies for renewable resource allocation
In this paper we introduce a class of Markov decision processes that arise as a natural model for many renewable resource allocation problems. Upon extending results from the inventory control literature, we prove that they admit a closed form solution and we show how to exploit this structure to speed up its computation. We consider the application of the proposed framework to several problems...
متن کاملOptimal resource allocation and scheduling for the CELL BE platform
Resource allocation and scheduling for multicore platforms is one of the most critical challenges in today’s embedded computing. In this paper we focus on a well-known multicore platform, namely the Cell BE processor, and we address the problem of allocating and scheduling its processors, communication channels and memories, with the goal of minimizing execution time for complex data streaming ...
متن کاملConstrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack
This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...
متن کاملNew Optimal Load Allocation for Scheduling Divisible Data Grid Applications
In many data grid applications, data can be decomposed into multiple independent sub-datasets and distributed for parallel execution and analysis. This property has been successfully employed by using Divisible Load Theory (DLT), which has been proved as a powerful tool for modeling divisible load problems in data-intensive grid. There are some scheduling models have been studied but no optimal...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Energies
سال: 2020
ISSN: 1996-1073
DOI: 10.3390/en13215683