Optimal preventive maintenance interval model with time value of money consideration
نویسندگان
چکیده
The search for a plant maintenance strategy to mitigate the impact of random factory machine failures has never been more challenging. Apart from harsh global competition, manufacturing facilities have become sophisticated and expensive; frequent prolonged breakdowns may ruin firm’s business. Consequently, many turned Preventive Maintenance (PM) solution. However, efficacy PM shown depend on finding time interval decision model capable incorporating most relevant cost components. While past studies considered system set-up, execution, breakdown components, literature is sparse models borrowing money. Exploring feasibility developing such aim this study. Accordingly, maintenance-investment function was formulated in terms reliability; problem then defined solved as that investment minimization. Using three cases literature, optimal intervals (238.11, 14695.28, 2076.54), failure probabilities (0.71, 0.35, 0.61), costs preventive (840950.87, 149352.55, 33979.57) were found be reasonable.
منابع مشابه
Optimal asset control of the diffusion model under consideration of the time value of ruin
In this paper, we consider the optimal asset control of a financial company which can control its liquid reserves by paying dividends and by issuing new equity. We assume that the liquid surplus of the company in the absence of control is modeled by the diffusion model. It is a hot topic to maximize the expected present value of dividends payout minus equity issuance until the time of ba...
متن کاملoptimal asset control of the diffusion model under consideration of the time value of ruin
in this paper, we consider the optimal asset control of a financial company which can control its liquid reserves by paying dividends and by issuing new equity. we assume that the liquid surplus of the company in the absence of control is modeled by the diffusion model. it is a hot topic to maximize the expected present value of dividends payout minus equity issuance until the time of ba...
متن کاملAn Optimal Preventive Maintenance Model to Enhance Availability and Reliability of Flexible Manufacturing Systems
General preventive maintenance model for the components of a system, which improves the reliability to ‘as good as new,’ was used to optimize the maintenance cost. The cost function of a maintenance policy was minimized under given availability constraint. On the other hand, in order to ensure appropriate reliability and availability, the development of the optimal maintenanc...
متن کاملMoney-back guarantee warranty policy with preventive maintenance strategy for sensor-embedded remanufactured products
In today’s global environment, technology is constantly evolving. Being able to stay up-to-date with the very latest technological advances can be extremely hard to accomplish. As a result of these changes and developments in technology, which often come unexpectedly, consumers are frequently tempted to update their devices to the very latest model. The result is that the life cycle of a produc...
متن کاملIntroducing the Time Value of Money in a Non-consignment Vendor Managed Inventory Model
Vendor managed inventory (VMI) is an integrated approach for buyer–vendor coordination, according to which the vendor (supplier or manufacturer) decides on the appropriate buyer’s (retailer’s) inventory levels. The time value of money has not traditionally been considered in evaluating VMI supply chain’s total inventory cost in any studies up to now. Therefore, in the present study a new model ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Global Journal of Engineering and Technology Advances
سال: 2022
ISSN: ['2582-5003']
DOI: https://doi.org/10.30574/gjeta.2022.12.2.0112