Optimal Multistage Production Scheduling with Setup Times considered
نویسندگان
چکیده
منابع مشابه
Selfish Scheduling with Setup Times
We study multiprocessor scheduling games with setup times on identical machines. Given a set of scheduling policies (coordination mechanism) on the machines, each out of n players chooses a machine to assign his owned job to, so as to minimize his individual completion time. Each job has a processing length and is of a certain type. Same-type jobs incur a setup overhead to the machine they are ...
متن کاملSplit scheduling with uniform setup times
We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a machine cannot process or set up any other job. We concentrate on the basic case in which setup times are job-, machineand s...
متن کاملScheduling Approach for Microfactories with Setup Times
In this paper we consider microfactories for manipulation and assembly. These microfactories are composed of several cells containing microrobotic systems capable of a high level of repeatability. The assembly plan of the production is a pipeline of tasks that are performed by the cells. Our aim is to manage the production flow in the case where the cells can be reconfigured to perform differen...
متن کاملSetup times optimization with considering maintenance scheduling by using nonlinear modeling
The present paper, titled “optimizing the time of preparation, taking into account the timing of repair and maintenance using non-linear modeling”, has been implemented with the aim of designing and presenting a mathematical model to get the best sequence of operations leading to minimum the total time of production. The main research question is related to the reduction of time and productio...
متن کاملPareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C
سال: 1979
ISSN: 0387-5024,1884-8354
DOI: 10.1299/kikaic.45.856