Optimal Maintenance Scheduling of Local Public Purpose Buildings
نویسندگان
چکیده
منابع مشابه
Reducing Operating Costs with Optimal Maintenance Scheduling
The potential benefits of optimal service scheduling for cleaning heat exchangers based on minimizing operating costs are explored. A demonstration is performed on a simulated 20 ton air-to-air vapor compression air conditioner. The costs of regular service schedules (indicative of current practice), minimal schedules needed to maintain comfort, and the optimal schedules are compared. Generally...
متن کاملOptimal maintenance scheduling of generators using multiple swarms-MDPSO framework
In this paper, a challenging power system problem of effectively scheduling generating units for maintenance is presented and solved. The problem of generator maintenance scheduling (GMS) is solved in order to generate optimal preventive maintenance schedules of generators that guarantee improved economic benefits and reliable operation of a power system, subject to satisfying system load deman...
متن کاملComponent redundancy allocation in optimal cost preventive maintenance scheduling
This work presents a methodology to assess maintenance teams in the determination of the degree of redundancy that an active component must have in order to minimize its system life-cycle cost and in the definition of the corresponding maintenance plan schedule. The minimal required data are three average costs and one reliability function. It is useful in a system’s design phase, since in this...
متن کاملiii OPTIMAL INFRASTRUCTURE MAINTENANCE SCHEDULING PROBLEM UNDER BUDGET UNCERTAINTY
This research addresses a general class of infrastructure asset management problems. Infrastructure agencies usually face budget uncertainties that will eventually lead to suboptimal planning if maintenance decisions are made without taking the uncertainty into consideration. It is important for decision makers to adopt maintenance scheduling policies that take future budget uncertainty into co...
متن کاملIterated Local Search for the Generator Maintenance Scheduling Problem
We consider the task of devising an effective metaheuristic for a variant of the preventive maintenance scheduling problem (PMSP) — the (power) generator maintenance scheduling problem (GMSP). Recent research on metaheuristics for this problem has made progress on it, but the potential economic benefits of effective methods is significant in this area, and warrants further focused work. We prop...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: SSRN Electronic Journal
سال: 2014
ISSN: 1556-5068
DOI: 10.2139/ssrn.2528402