Optimal Investing after Retirement Under Time-Varying Risk Capacity Constraint
نویسندگان
چکیده
منابع مشابه
Optimal Coding Subgraph Selection under Survivability Constraint
Nowadays communication networks have become an essential and inevitable part of human life. Hence, there is an ever-increasing need for expanding bandwidth, decreasing delay and data transfer costs. These needs necessitate the efficient use of network facilities. Network coding is a new paradigm that allows the intermediate nodes in a network to create new packets by combining the packets recei...
متن کاملOptimal Design of Geometrically Nonlinear Structures Under a Stability Constraint
This paper suggests an optimization-based methodology for the design of minimum weight structures with kinematic nonlinear behavior. Attention is focused on three-dimensional reticulated structures idealized with beam elements under proportional static loadings. The algorithm used for optimization is based on a classical optimality criterion approach using an active-set strategy for extreme lim...
متن کاملOptimal Rebalancing of Portfolio Weights under Time-varying Return Volatility
This paper considers horizon effects on portfolio weights under time varying and forecastable return volatility. The return volatility is modelled as a GARCH-M, which is general enough to encompass both constant and time varying mean. The analysis confirms earlier results, namely that there are no horizon effects when the stochastic process, that governs asset returns, has constant mean. Howeve...
متن کاملMulti-Cost Optimal Route Planning Under Time-Varying Uncertainty
Different uses of a road network call for the consideration of different travel costs: in route planning, travel time and distance are typically considered, and green house gas (GHG) emissions are increasingly being considered. Further, costs such as travel time and GHG emissions are time-dependent and uncertain. To support such uses, we propose techniques that enable the construction of a mult...
متن کاملOptimal flexible capacity in newsboy problem under stochastic demand and lead-time
In this paper, we consider a newsvendor who is going to invest on dedicated or flexible capacity, our goal is to find the optimal investment policy to maximize total profit while the newsvendor faces uncertainty in lead time and demand simultaneously. As highlighted in literature, demand is stochastic, while lead time is constant. However, in reality lead time uncertainty decreases newsvendor's...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: SSRN Electronic Journal
سال: 2020
ISSN: 1556-5068
DOI: 10.2139/ssrn.3612488