Optimal delay analysis for real-time traffics over IEEE 802.11 wireless LANs
نویسندگان
چکیده
منابع مشابه
Scheduling of real-time traffic in IEEE 802.11 wireless LANs
The desire to provide universal connectivity for mobile computers and communication devices is fueling a growing interest in wireless packet networks. To satisfy the needs of wireless data networking, study group 802.11 was formed under IEEE project 802 to recommend an international standard for Wireless Local Area Networks (WLANs). A key part of the standard are the Medium Access Control (MAC)...
متن کاملVoIP over Multiple IEEE 802.11 Wireless LANs
IEEE 802.11 WLAN has high data rate (e.g., 11Mbps for 802.11b and 54Mbps for 802.11g) while voice stream of VoIP has low data rate requirement (e.g., 29.2Kbps). One may therefore expect WLAN to be able to support a large number of VoIP sessions (e.g., 200 and 900 sessions in 802.11b and 802.11g, respectively). Prior work by one of the authors, however, indicated that 802.11 is extremely ineffic...
متن کاملReal-Time Performance Guarantees over Wired/Wireless LANs
Distributed audio and video applications require end-to-end performance guarantees from the underlying networks for smooth delivery of real-time media streams. The end-to-end nature dictates that real-time support be built into both wide-area and local-area networks. With the enormous growth of portable computers equipped with networking capabilities, it is important to develop real-time protoc...
متن کاملFair Scheduling of Real-time Traffic over Wireless LANs
With the advent of the IEEE 802.11 wireless networks that provide high speed connectivity, demand for supporting multiple real-time traffic applications over wireless LANs has been increasing. A natural question is how to provide fair resource allocation to real-time traffic in wireless LANs. Wireless networks are subject to unpredictable location-dependent error bursts, which is different from...
متن کاملMulticast and unicast real-time video streaming over wireless LANs
In this paper, we address the problem of real-time video streaming over wireless LANs for both unicast and multicast transmission. The wireless channel is modeled as a packet-erasure channel at the IP level. For the unicast scenario, we describe a novel hybrid Automatic Repeat reQuest (ARQ) algorithm that efficiently combines forward error control (FEC) coding with the ARQ protocol. For the mul...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: EURASIP Journal on Wireless Communications and Networking
سال: 2016
ISSN: 1687-1499
DOI: 10.1186/s13638-016-0545-0