Optimal control approaches for open pit planning
نویسندگان
چکیده
This work tackles the open pit planning problem in an optimal control framework. We study optimality conditions for so-called continuous formulation using Pontryagin’s Maximum Principle, and introduce a new, semi-continuous that can handle optimization of two-dimensional mine profile. Numerical simulations are provided several test cases, including global one-dimensional final pit, first results sequential pit. Theses indicate good consistency between different approaches, with theoretical conditions.
منابع مشابه
Risk Averse Approaches in Open-pit Production Planning under Ore Grade Uncertainty: a Ultimate Pit Study
During early phases of open-pit mining production planning many parameters are uncertain, and since the mining operation is performed only once, any evaluations based only on on average outcomes neglects the very real chance of obtaining an outcome that is below average. Taking into account also that operation costs are considerable and the mining horizon usually extends over several decades it...
متن کاملMulti-objective approaches for the open-pit mining operational planning problem
This work presents three multi-objective heuristic algorithms based on Two-phase Pareto Local Search with VNS (2PPLS-VNS), Multi-objective Variable Neighborhood Search (MOVNS) and Non-dominated Sorting Genetic Algorithm II (NSGA-II). The algorithms were applied to the open-pit-mining operational planning problem with dynamic truck allocation (OPMOP). Approximations to Pareto sets generated by t...
متن کاملA Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملA continuous framework for open pit mine planning
This paper proposes a newmathematical framework for the open pit mine planning problem, based on continuous functional analysis. The main challenge for engineers is to determine a sequence of nested profiles maximizing the net present value of the mining operation. The traditional models for this problem have been constructed by using binary decision variables, giving rise to large-scale combin...
متن کاملA continuous model for open pit mine planning∗
This paper proposes a new mathematical model for the open pit mine planning problem, based on continuous functional analysis. The traditional models for this problem have been constructed by using discrete 0−1 decision variables, giving rise to large-scale combinatorial and Mixed Integer Programming (MIP) problems. Instead, we use a continuous approach which allows for a refined imposition of s...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Optimization and Engineering
سال: 2023
ISSN: ['1389-4420', '1573-2924']
DOI: https://doi.org/10.1007/s11081-023-09797-w