Opportunistic inspection planning for Railway eMaintenance
نویسندگان
چکیده
منابع مشابه
Railway track inspection using GPR
Ž . Swiss Federal Railways SBB inspect their railway tracks at regular intervals. The first step of track renewal planning is a geotechnical study. Inspection is focused on the thickness of the ballast, on subsoil material penetrating upwards into the ballast and on geotechnical properties of subgrade and subsoil materials. Up to now, the inspection has been done mainly by digging trenches at e...
متن کاملData Augmentation of Railway Images for Track Inspection
Regular maintenance of all the assets is pivotal for proper functioning of railway. Manual maintenance can be very cumbersome and leave room for errors. Track anomalies like vegetation overgrowth, sun kinks affect the track construct and result in unequal load transfer, imbalanced lateral forces on tracks which causes further deterioration of tracks and can ultimately result in derailment of lo...
متن کاملAutomated System for Magnetic Particle Inspection of Railway Wheels
This paper presents a new developed automated system used for flaw detection and classification on railway wheels. The described system uses the principle of non-destructive method based magnetic particle inspection. Our proposed and finally constructed automated system is used in industrial applications where non-destructive testing of railway wheels is desired. As a part of testing line, it i...
متن کاملMachine vision for automated inspection of railway traffic recordings
For the 9000 train accidents reported each year in the European Union [1], the Recording Strip (RS) and Filling-Card (FC) related to the train activities represent the only usable evidence for SNCF (the French railway operator) and most of National authorities. More precisely, the RS contains information about the train journey, speed and related Driving Events (DE) such as emergency brakes, wh...
متن کاملRecoverable Robustness for Railway Rolling Stock Planning
In this paper we explore the possibility of applying the notions of Recoverable Robustness and Price of Recoverability (introduced by [5]) to railway rolling stock planning, being interested in recoverability measures that can be computed in practice, thereby evaluating the robustness of rolling stock schedules. In order to lower bound the Price of Recoverability for any set of recovery algorit...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2016
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2016.11.034