Operational Experiences at Otake Geothermal Power Station

نویسندگان

چکیده

منابع مشابه

Maintenance Staff Scheduling at Afam Power Station

This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek sched...

متن کامل

Technical possibility assessment of creating wind power station at Soltanieh zone of Zanjan province

Due to increasing expansion of energy consumption and also the decrease and tendency towardsending fossil energy reserves, the current energy cycle needs to use alternative energy speciallywind energy, because it’s considerably cheaper than other recycling sources. The presentresearch investigates suitable possibility of exploiting wind energy to create wind power stationin Soltanieh zone of Za...

متن کامل

Complete Francis turbine flow simulation at Derbendikan power station

This paper presents the results of simulations of the complete three-dimensional fluid flow through the Spiral Casing, Stay Vane, Guide Vane, and then through the Francis turbine runner of the Derbendikan power station. To investigate the flow in the Francis turbine and also to identify the loads acting on the turbine blades, a three-dimensional model was prepared according to specifications pr...

متن کامل

Power Consumption Minimization of Khormoj Compressor Station

Arguably, the natural gas transmission pipeline infrastructure in Iran represents one of the largest and most complex mechanical systems in the world. The optimization of large gas trunk lines known as IGAT results in reduced fuel consumption or higher capability and improves pipeline operation. In the current study, a single-objective optimization was conducted for Khormoj compressor station o...

متن کامل

Small Capacity Geothermal Binary Power Generation System

Japan is a volcanic country having abundant geothermal resources. To date, Japan has 20 geothermal power generation facilities, with a total installed capacity of 550 MW. Most of these facilities are large capacity geothermal power plants constructed by utility power companies, but due to various circumstances, there are no further plans to build large capacity plants in the near future. The Ne...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Fuel Society of Japan

سال: 1972

ISSN: 0369-3775,2185-226X

DOI: 10.3775/jie.51.291