Operation related maintenance and reinvestment costs for hydropower scheduling

نویسندگان

چکیده

Abstract This paper addresses the questions: How to calculate cost of a start/stop cycle? running one hour outside normal operating range, e.g., on part load? The presents model for calculation individual hydropower units comprising both direct costs incurring at each cycle, and indirect because reduced rehabilitation intervals main components. fundamental assumption is that frequent start-ups lead increased stress, degradation wear reducing residual service life equivalent certain number hours, thus accelerating need rehabilitation. proposed used average marginal cycle. When calculating cost, technical condition turbine generator as well length stand-still period can be considered. Applying similar approach, extended ramping, load overload operation, i.e., when using unit range. extension operation related important include deciding scheduling in systems with large shares variable generation from wind solar. Such are very consider optimal strategy power where delivers flexibility terms following different types reserves.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimizing a reverse supply chain including transportation, operation, maintenance and remanufacturing costs

Reverse supply chain is a process dealing with the backward flows of used/damaged products or materials. Reverse supply chain includes activities such as collection, inspection, reprocess, disposal and redistribution. A well-organized reverse supply chain can provide important advantages such as economic and environmental ones. In this study, we propose a general framework and formulate a m...

متن کامل

Mathematical Model and Solution Algorithm for Containership Operation/Maintenance Scheduling

This study considers the problem of determining operation and maintenance schedules for a containership equipped with components during its sailing according to a pre-determined navigation schedule. The operation schedule, which specifies work time of each component, determines the due-date of each maintenance activity, and the maintenance schedule specifies the actual start time of each mainte...

متن کامل

Reducing Operating Costs with Optimal Maintenance Scheduling

The potential benefits of optimal service scheduling for cleaning heat exchangers based on minimizing operating costs are explored. A demonstration is performed on a simulated 20 ton air-to-air vapor compression air conditioner. The costs of regular service schedules (indicative of current practice), minimal schedules needed to maintain comfort, and the optimal schedules are compared. Generally...

متن کامل

Bi-level Model for Reliability based Maintenance and Job Scheduling

Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...

متن کامل

Minimizing Service and Operation Costs of Periodic Scheduling (Extended Abstract)

We study the problem of scheduling activities of several types under the constraint that at most a xed number of activities can be scheduled in any single time-slot. Any given activity type is associated with a service cost and an operating cost that increases linearly with the number of time-slots since the last service of this type. The problem is to nd an optimal schedule that minimizes the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energy Systems

سال: 2023

ISSN: ['1868-3975', '1868-3967']

DOI: https://doi.org/10.1007/s12667-023-00589-w