منابع مشابه
Operating Experience with Raydac
THE RA YDAC acceptance tests were run from June 4 to July 19, 1952, in five sessions of 3 days each. The tests were divided into three phases. Phase 1 consisted of programmed test routines which caused each unit of the computer to go through its various combinations of operations. This included tests of the terminal equipment, central control, and internal memory; the arithmetic unit; and the e...
متن کاملLENS Operating Experience
Indiana University is operating a Low Energy Neutron Source which provides cold neutrons for material research and neutron physics and MeV energy for the neutron radiation effects studies. Neutrons are being produced by a 13 MeV proton beam incident on a Beryllium target. The LENS Proton Delivery System (PDS) is routinely operating at 13 MeV and 25 mA at 1.8% duty factor. The RF system, consist...
متن کاملExperience Operating Systems
Teaching operating system need also practical experiments. Practical exercises in operating system up to now suffer from a high complexity of the experimental system, from concealing the internals of the operating system, and a scarce visibility of the phenomenon. The new capabilities of modern computers, and devices, respectively, associated with new concepts of operating system practical exer...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: JAPAN TAPPI JOURNAL
سال: 1995
ISSN: 0022-815X,1881-1000
DOI: 10.2524/jtappij.49.50