Open Pit Optimization Using the Floating Cone Method: A New Algorithm
نویسندگان
چکیده
Three-dimensional block models are the most frequently used tool for estimating mineral resources and reserves within a deposit. In open pit mining, basis of mine design long term mining schedule is calculation ultimate limit. The limit with highest profit value. Over years, different algorithms have been developed that enable us to calculate final pit: floating or mobile cone, cone II its corrected forms, III, Korobov algorithm form, Lerchs–Grossmann 2D (dynamic programming), 3D (graph theory). All these advantages disadvantages. method stands out simplicity, speed, easy implementation, even calculating variable slope angle. main drawback this it unable examine all possible combinations. For reason, does not consistently give optimal results, which why has required improvements over time. However, improved methods still some problems. To overcome problems, new called IV will be demonstrated in paper.
منابع مشابه
A new algorithm for optimum open pit design: Floating cone method III
Ultimate limits of an open pit, which define its size and shape at the end of the mine’s life, is the pit with the highest profit value. A number of algorithms such as floating or moving cone method, floating cone method II and the corrected forms of this method, the Korobov algorithm and the corrected form of this method, dynamic programming and the Lerchs and Grossmann algorithm based on grap...
متن کاملa new algorithm for optimum open pit design: floating cone method iii
ultimate limits of an open pit, which define its size and shape at the end of the mine’s life, is the pit with the highest profit value. a number of algorithms such as floating or moving cone method, floating cone method ii and the corrected forms of this method, the korobov algorithm and the corrected form of this method, dynamic programming and the lerchs and grossmann algorithm based on grap...
متن کاملOpen pit limit optimization using dijkstra’s algorithm
In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...
متن کاملsolution of security constrained unit commitment problem by a new multi-objective optimization method
چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...
A new algorithm for the open-pit mine scheduling problem
For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extracted first, and capacity constraints limit the production each time period. ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Minerals
سال: 2022
ISSN: ['2075-163X']
DOI: https://doi.org/10.3390/min12040495