In the production process of open-pit mines, trucks are applied in mines for transporting ores and rocks. Most equipped with dozens trucks. It is important to plan dispatch so that transportation can be shortest distance, lowest cost, most efficient. At present, many mining enterprises have realized use dispatching systems schedule complete tasks. However, these methods mostly designed deploy reduce costs without considering blending problem selected ores, therefore it cannot meet dual need ore dispatching. order solve above technical problems actual needs current mine dispatching, this paper proposes an truck system based on dynamic decisions, supported by a 4G/5G wireless network, Beidou positioning, Internet Things technology, which not only realize optimized production, but also requirements downstream concentrators dressing grade. The has been Ansteel Group QIDASHAN one year. proportion dispatched through reached more than 70%. trucks’ capacity were upgraded from 3.79 4 million ton km per set year, efficiency was improved 5.5%. limitations proposed method mainly include possibility inaccurate measurement output lack combination unmanned driving.
منابع مشابه
Swarm –Based Truck-Shovel Dispatching System in Open Pit Mine Operations
The dispatch of trucks and shovel has always been an important component in the success of open pit mine operations. Dispatch systems have evolved from manual to today automatic with almost no human intervention. Although dispatching systems available today are “pseudo real time” and efficient, the optimal dispatching is realized over subsets of the fleet when dealing with large fleets. This ap...
متن کاملA Two-Phase Simulation-Based Optimization of Hauling System in Open-Pit Mine
One of the key issues in mining is the hauling system. Truck and shovels are the most widely used transportation equipment in mines. In this paper, a two-phase simulation-based optimization is presented to maximize utilization of hauling system in the largest Iranian open-pit copper mine. In the first phase, The OptQuest for Arena software package was used to solve the optimization problem to p...
متن کاملORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming
Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...
متن کاملAnalyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran
Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...
متن کاملScheduling in iron ore open-pit mining
During the last few years, most production-based businesses have been under enormous pressure to improve their top-line growth and bottom-line savings. As a result, many companies are turning to systems and technologies that can help optimise their supply chain activities. In this paper, we discuss a real-world application of scheduling in the mining industry. This is a highly constrained probl...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2023
ISSN: ['2071-1050']
DOI: https://doi.org/10.3390/su15043399