Open-Loop Responses of Flexible Gantry Crane System
نویسندگان
چکیده
منابع مشابه
Dynamic Behaviour of a Nonlinear Gantry Crane System
This paper presents investigations of dynamic behaviour of a nonlinear Gantry Crane System (GCS). The dynamic model is derived using Lagrange equation. Various system parameters of the system are tested to observe the actual behaviour of the dynamic model system. System responses including trolley displacement and payload oscillation are analyzed. Simulation is conducted within Matlab environme...
متن کاملA Reconfigurable Projection System For Several Gantry Crane Simulators
Simulator systems are increasing their potential for training personnel in areas where the risks and the safety tasks at work are very important. Taking into account the fact that practical training and related tasks are one of the most dangerous phases involved in the process of becoming a skilled operator, simulators have been introduced in these areas with a lot of success. The new simulatio...
متن کاملFlatness Based Control of a Gantry Crane
This contribution deals with flatness based control of a laboratory model of a gantry crane. The mechanical model has 3DOFs, where a trolley can be moved on a rail, the load is fixed at the end of a rope and can be lifted or lowered by coiling or uncoiling this rope on a cylinder. Under the assumption that the rope is always stretched, the underactuated system is not input to state linearisable...
متن کاملModel Predictive Control of Gantry Crane with Input Nonlinearity Compensation
Abstract—This paper proposed a nonlinear model predictive control (MPC) method for the control of gantry crane. One of the main motivations to apply MPC to control gantry crane is based on its ability to handle control constraints for multivariable systems. A pre-compensator is constructed to compensate the input nonlinearity (nonsymmetric dead zone with saturation) by using its inverse functio...
متن کاملInvestigation of Single Cart Gantry Crane System Performance using Scheduling Algorithm
This paper investigates the implementation of two types of scheduling algorithm to obtain the best performances of the Single Cart Gantry Crane System (GCS). In this research, Deadline Monotonic Priority Assignment (DMPA) and Earliest Deadline First (EDF) scheduling algorithm are chosen to be implemented. The main ideas of this approach is to find the schedule that more compatible and provide m...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Applied Sciences
سال: 2011
ISSN: 1812-5654
DOI: 10.3923/jas.2011.1716.1724