Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated system for BIM-based collaborative design

a r t i c l e i n f o Keywords: BIM Collaborative design Integrated design system Data exchange IFC For effective collaboration among construction project participants, the use of Building Information Model (BIM) has become more common throughout the building life cycle. However, due to the use of different BIM-based software among collaborators during the design, a variety of problems have occ...

متن کامل

Integrating building information modeling (BIM) and LEED system at the conceptual design stage of sustainable buildings

Designing environmentally friendly buildings that provide both high performance and cost savings is of increasing interest in the development of sustainable cities. Today, we are looking at not just buildings’ certification but sustainable practices that go beyond ratings to satisfy our social responsibilities. The construction industry in general will benefit from an integrated tool that will ...

متن کامل

Cut-off Sampling Design: Take all, Take Some, and Take None

Extended Abstract. Sampling is the process of selecting units (e.g., people, organizations) from a population of interest so that by studying the sample we may fairly generalize our results back to the population from which they were chosen. To draw a sample from the underlying population, a variety of sampling methods can be employed, individually or in combination. Cut-off sampling is a pr...

متن کامل

simulation and design of electronic processing circuit for restaurants e-procurement system

the poor orientation of the restaurants toward the information technology has yet many unsolved issues in regards to the customers. one of these problems which lead the appeal list of later, and have a negative impact on the prestige of the restaurant is the case when the later does not respond on time to the customers’ needs, and which causes their dissatisfaction. this issue is really sensiti...

15 صفحه اول

A Knowledge-Based Framework for Quantity Takeoff and Cost Estimation in the AEC Industry Using BIM

An important set of information provided through Building Information Modeling (BIM) platforms are quantitative properties of design elements and assemblies. The capability to extract or deduce such quantitative properties from explicit and implicit model information is essential for bidding, procurement, production planning, and cost control activities in the AEC projects. Current solutions fo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Computational Design and Engineering

سال: 2014

ISSN: 2288-5048

DOI: 10.1016/j.jcde.2014.11.002