On the Net Present Value Rule for Educational Investments

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Expected net present value , expected net future value , and the Ramsey rule Christian

Weitzman (1998) showed that when future interest rates are uncertain, using the expected net present value implies a term structure of discount rates that is decreasing to the smallest possible interest rate. On the contrary, using the expected net future value criteria implies an increasing term structure of discount rates up to the largest possible interest rate. We reconcile the two approach...

متن کامل

Expected net present value, expected net future value, and the Ramsey rule

Weitzman (1998) showed that when future interest rates are uncertain, using the expected net present value implies a term structure of discount rates that is decreasing to the smallest possible interest rate. On the contrary, using the expected net future value criteria implies an increasing term structure of discount rates up to the largest possible interest rate. We reconcile the two approach...

متن کامل

Project Portfolio Selection with the Maximization of Net Present Value

Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...

متن کامل

A Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value

This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).&#10In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...

متن کامل

A Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value

This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA). In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have be...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Political Economy

سال: 1972

ISSN: 0022-3808,1537-534X

DOI: 10.1086/259894