On the complexity of open shop scheduling with time lags
نویسندگان
چکیده
The minimization of makespan in open shop with time lags has been to be shown NP-hard the strong sense even for case two machines and unit-time operations. total completion time, however, remained that though it weighted or jobs release dates. This note shows operations is which answers long standing question.
منابع مشابه
Flow shop scheduling with multiple operations and time lags
A scheduling system is proposed and developed for a special type of flow shop. In this flow shop there is one machine at each stage. A job may require multiple operations at each stage. The first operation of a job on stage j cannot start until the last operation of the job on stage j-1 has finished. Preemption of the operations of a job is not allowed. The flow shop that we consider has anothe...
متن کاملthe effects of time planning and task complexity on accuracy of narrative task performance
هدف اصلی این تحقیق بررسی تاثیر برنامه ریزی زمانی، هم چنین افزایش میزان پیچیدگی تکالیف در نظر گرفته شده بصورت همزمان، بر دقت و صحت و پیچیدگی عملکرد نوشتاری زبان آموزان می باشد. بدین منظور، 50 نفر از دانش آموزان دختر در رده ی سنی 16 الی 18 سال به عنوان شرکت کنندگان در این زمینه ی تحقیق در نظر گرفته شدند و به دو گروه آزمایشی و کنترل بصورت اتفاقی تقسیم شدند. اعضای گروه آزمایشی هر دو تکلیف ساده و پی...
the effect of task cognitive complexity and time limit on the performance of the learners with different proficiency levels in second language writing skill
this study investigated the effects of manipulating the cognitive complexity of tasks along +/- few elements and the time limits on l2 learners writing performance. to conduct the study, 60 iranian efl learners with two levels of proficiency, low and high intermediate, were selected and assigned to three groups based on the time devoted to task completion. the participants performed both a simp...
15 صفحه اولA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
متن کاملA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Scheduling
سال: 2022
ISSN: ['1099-1425', '1094-6136']
DOI: https://doi.org/10.1007/s10951-022-00769-z