On Performance Modeling for MANETs Under General Limited Buffer Constraint
نویسندگان
چکیده
منابع مشابه
On throughput capacity for a class of buffer-limited MANETs
Available throughput performance studies for mobile ad hoc networks (MANETs) suffer from two major limitations: they mainly focus on the scaling law study of throughput, while the exact throughput of such networks remains largely unknown; they usually consider the infinite buffer scenarios, which are not applicable to the practical networks with limited buffer. As a step to address these limita...
متن کاملSecure Routing Protocol: Affection on MANETs Performance
In mobile ad hoc networks, the absence ofinfrastructure and the consequent absence of authorizationfacilities impede the usual practice of establishing a practicalcriterion to distinguishing nodes as trusted and distrusted.Since all nodes in the MANETs would be used as router inmulti-hop applications, secure routing protocols have vital rulein the security of the network. So evaluating the perf...
متن کاملModeling General Constraint Satisfaction Problems
1. Max-3-SAT: In this case, Γ represents the OR-predicate. 2. Max-Cut: We can model this as a CSP where the vertices that get assigned to one side get 0 value and the other gets 1; so the domain set is D = {0, 1}. The set Γ contains only 6= predicate. 3. Max-E3-LIN2: The domain is {0, 1}. There are two types of precidates in Γ, i.e. xi + xj + xk = 0 and xi + xj = xk = 1 (under modolu two.) 4. M...
متن کاملConcurrent Flip-flop and Buffer Insertion under Pipeline Constraint*
In complex digital systems with high operating frequencies and large chip sizes, concurrent flip-flop and buffer insertion becomes inevitable for interconnect optimization. To preserve functional integrity, the pipeline constraint must be satisfied. Moreover, blockage avoidance, power reduction, and timing margin increase are also important issues. In this paper, we study the problem of blockag...
متن کاملConstraint Modeling and Buffer Management with Integrated Production Scheduler
Constraint modeling is a necessary step in construction planning. The basic CPM approach provides a simple and practical means for resolving time-related precedence constraints between activities. However, most CPM-based tools do not support dealing with the constraints regarding resource and information availabilities at the productionlevel planning phase. When these constraints are concealed ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Vehicular Technology
سال: 2017
ISSN: 0018-9545,1939-9359
DOI: 10.1109/tvt.2017.2710099