On Heuristic Approach for Solution of Scheduling Problem Involving Transportation Time and Break-down Times for Three Machines

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Heuristic Approach Forn-jobs, 3 Machines Flow Shop Scheduling Problem Involving Transportation Time, Equivalent Job-block, Weights of Jobs and Break down Time Interval

In 1980 Miyazaki considered the weight of a job in which weight shows the relative priority over some other job in a sequencing of different jobs. After that some researchers such as Ghanshiam Das, Singh and Singhal [1981], Panwalker [1991] Sotskov, Allahverdi and Lai [2000], Chandramouli (2005) and Belwal, Mittal (2008) had considered the idea of N-job 2 machine flow shop scheduling problem wi...

متن کامل

Heuristic Approach for N-job, 3-machine Flow Shop Scheduling Problem Involving Transportation Time, Break down Time and Weights of Jobs

This paper provides a new simple heuristic algorithm for a ‘3-Machine, njob’ flow-shop scheduling problem in which jobs are attached with weights to indicate their relative importance and the transportation time and break down intervals of machine are given. A heuristic approach method to find optimal or near optimal sequence minimizing the total weighted mean production flow time for the probl...

متن کامل

An Evolutionary Approach for Solving the N-Jobs M-Machines Permutation Flow-Shop Scheduling Problem with Break-Down Times

In this paper a Genetic Algorithm (GA) approach is presented to solve the N-Jobs M-Machines Permutation Flow-Shop Scheduling Problem (PFSP) with Break-down times. In comparison with other methods that start with a solution obtained with the Johnson’s Algorithm (or another greedy approach), the presented GA method starts with randomly generated solutions and within 100 iterations is able to obta...

متن کامل

Two meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning

This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...

متن کامل

Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times

This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Research Journal of Applied Sciences, Engineering and Technology

سال: 2014

ISSN: 2040-7459,2040-7467

DOI: 10.19026/rjaset.7.573