On elimination method of distortion near cut-off flange edge of channel section with thick wall.

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

News Section CIRCUMVENTINGTHE CUT-OFF FOR ENRICHMENTANALYSIS

CIRCUMVENTINGTHE CUT-OFF FOR ENRICHMENTANALYSIS Abstract Three tools for threshold-free enrichment analysis of microarray data are introduced: GSEA (gene set enrichment analysis), ermineJ and DRIM (discovering rank imbalanced motifs).GSEA offers an interface to a specific algorithm and a well-defined pipeline for the identifying enrichment in diverse gene sets and the creation of signature prof...

متن کامل

The Effect of Cut-off Wall on Seepage and Uplift Pressure under Earth Dam (Case Study: Shamil Dam in Iran)

Design of earth dams and their problems are important during construction and after it,because of their potential hazards and failure for downstream population. The dam foundation seepage control the the importance from the perspective of a major engineering project and explain the economic performance of each project is allocated. among activities that can be used to prevent piping phenomena a...

متن کامل

The Investigation of Effective Factors in the Removal of Bentonite Jelly from the Joints of Cut-off Wall Panels

In the construction process of a plastic concrete cut-off wall, concreting is usually performed using the termie pipe method. In this method, concreting is performed from the lowest point in the excavated trench (containing the slurry) using a funnel and the pipe connected to it. The concrete poured in the funnel gradually settles in the panel through the termie pipe which is beneath the slurry...

متن کامل

Comparison of golden section search method and imperialist competitive algorithm for optimization cut-off grade- case study: Mine No. 1 of Golgohar

Optimization of the exploitation operation is one of the most important issues facing the mining engineers. Since several technical and economic parameters depend on the cut-off grade, optimization of this parameter is of particular importance. The aim of this optimization is to maximize the net present value (NPV). Since the objective function of this problem is non-linear, three methods can b...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C

سال: 1986

ISSN: 0387-5024,1884-8354

DOI: 10.1299/kikaic.52.1678