On Curve Estimation by Minimizing Mean Absolute Deviation and Its Implications
نویسندگان
چکیده
منابع مشابه
MULTIPERIOD CREDIBILITIC MEAN SEMI-ABSOLUTE DEVIATION PORTFOLIO SELECTION
In this paper, we discuss a multiperiod portfolio selection problem with fuzzy returns. We present a new credibilitic multiperiod mean semi- absolute deviation portfolio selection with some real factors including transaction costs, borrowing constraints, entropy constraints, threshold constraints and risk control. In the proposed model, we quantify the investment return and risk associated with...
متن کاملMinimizing weighted mean absolute deviation of job completion times from their weighted mean
We address a single-machine scheduling problem where the objective is to minimize the weighted mean absolute deviation of job completion times from their weighted mean. This problem and its precursors aim to achieve the maximum admissible level of service equity. It has been shown earlier that the unweighted version of this problem is NP-hard in the ordinary sense. For that version, a pseudo-po...
متن کاملMEAN-ABSOLUTE DEVIATION PORTFOLIO SELECTION MODEL WITH FUZZY RETURNS
In this paper, we consider portfolio selection problem in which security returns are regarded as fuzzy variables rather than random variables. We first introduce a concept of absolute deviation for fuzzy variables and prove some useful properties, which imply that absolute deviation may be used to measure risk well. Then we propose two mean-absolute deviation models by defining risk as abs...
متن کاملDetermining OWA Operator Weights by Mean Absolute Deviation Minimization
The ordered weighted averaging (OWA) operator uses the weights assigned to the ordered values rather than to the specific criteria. This allows one to model various aggregation preferences, preserving simultaneously the impartiality (neutrality) with respect to the individual attributes. The determination of ordered weighted averaging (OWA) operator weights is a crucial issue of applying the OW...
متن کاملMinimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots so that successive operations can be overlapped in a multi-stage production system. This paper presents a procedure for minimizing the mean weighted absolute deviation from due dates when jobs are scheduled in a lot-streaming #ow shop. This performance criterion has been shown to be non-regular and requires a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: The Annals of Statistics
سال: 1994
ISSN: 0090-5364
DOI: 10.1214/aos/1176325499