On Critical Path with Fuzzy Weights

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fuzzy Shortest-Path Network Problems With Uncertain Edge Weights

This paper presents two new types of fuzzy shortest-path network problems. We consider the edge weight of the network as uncertain, which means that it is either imprecise or unknown. Thus, the first type of fuzzy shortest-path problem uses triangular fuzzy numbers for the imprecise problem. The second type uses level (1 − β, 1 − α) interval-valued fuzzy numbers, which are based on past statist...

متن کامل

Fuzzy Critical Path Problem for Project Network

The task of finding the crisp critical path has received researcher’s attention over the past two decades which has wide range of applications in planning and scheduling the large projects. In most cases of our life, the data obtained for decision makers are only approximate, which gives rise to fuzzy critical path problem. In this paper, new ranking methods are introduced to identify the fuzzy...

متن کامل

Critical path analysis in the network with fuzzy activity times

A natural generalization of the criticality notion in a network with fuzzy activity times is given. It consists in direct application of the extension principle of Zadeh to the notion of criticality of a path (an activity, an event) treated as a function of the activities duration times in the network. There are shown some relations between the notion of fuzzy criticality, introduced in the pap...

متن کامل

A Fuzzy TOPSIS Approach with Subjective Weights and Objective Weights

Multiple criteria decision making (MCDM) is widely used in ranking one or more alternatives from a set of available alternatives with respect to multiple criteria. Inspired by MCDM which are methods to systematically evaluate alternatives, we propose a new Fuzzy TOPSIS for evaluating outsourcing software companies both using subjective and objective weights. While crisp data are inadequate to m...

متن کامل

A Greedy Algorithm for Fuzzy Shortest Path Problem using Quasi-Gaussian Fuzzy Weights

Several algorithms exist to determine the shortest path in a network for the crisp case where the weights are real numbers. In the real world, these weights represent parameters like cost, packet arrival time, link capacity etc which are not naturally precise. To model the uncertainty involved, for the first time we use the Gaussian fuzzy numbers as weights and a method has been presented in th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH

سال: 2018

ISSN: 0424-267X,1842-3264

DOI: 10.24818/18423264/52.4.18.04