"OKURE"(DELAY) AND "ZURE" (DISCREPANCY) OF BUILT-UP PROCESS IN LAND READJUSTMENT AREA
نویسندگان
چکیده
منابع مشابه
Monitoring the Built-up Area Transformation Using Urban Index and Normalized Difference Built-up Index Analysis
Makassar is one of the metropolitan cities located in Indonesia which recently experiences massive an increased construction because of population growth. Mapping the spatial distribution and development of the built-up region is the best method that can use as an indicator to set the urban planning policy. The purpose of this study is to identify changes in land use and density in Makassar Cit...
متن کاملEnhanced Built-Up and Bareness Index (EBBI) for Mapping Built-Up and Bare Land in an Urban Area
Remotely sensed imagery is a type of data that is compatible with the monitoring and mapping of changes in built-up and bare land within urban areas as the impacts of population growth and urbanisation increase. The application of currently available remote sensing indices, however, has some limitations with respect to distinguishing built-up and bare land in urban areas. In this study, a new i...
متن کاملLand Readjustment Implementations in Turkey
One of the land development problems of developing countries is to provide readily available land for new urbanization demands. Compensation based procedures are mostly used land provision methods around the world in urban land development applications but it is both expensive and mandatory. To provide new settlements and built-up areas, there should be a more effective land redistribution proc...
متن کاملExploring the Usefulness of Land Parcel Data for Evaluating Multi- Temporal Built-up Land Layers
The increasing amount of free and open remote sensing data suggests that a number of multitemporal land use and built-up land datasets derived from remotely sensed imagery will be made available soon. However, little research has been done regarding the approaches to evaluate spatiotemporal uncertainty of such products. Employing publicly available cadastral data with information on constructio...
متن کاملnumerical simulation of orthogonal cutting process and determination of built up layer thickness
the built up layer thickness in secondary deformation zone is one of the important parameters in metal cutting process. the built up layer (bul) is formed in second deformation zone near the tool-chip interface in the back of the chip. this parameter influences the tool life and machined surface quality. this bul should not be confused with the built up edge (bue). the deformation of the bul in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Transactions of the Architectural Institute of Japan
سال: 1982
ISSN: 0387-1185,2433-0027
DOI: 10.3130/aijsaxx.311.0_119