Offset Obligation in Defense Projects: Schedule, Budget, and Performance Implications

نویسندگان

چکیده

Using the three criteria known as “Iron Triangle,” this study examines and analyzes ramifications effects of offset constraints on defense projects. Such projects, managed vis-à-vis governments international authorities, contend with a constraint that does not exist in other domains: offset, an obligation condition for sale products to purchasing government. The combines qualitative tools, ten semi-structured interviews conducted academics professionals, quantitative surveys sent project managers people employed leading Israeli manufacturing companies. In-depth analysis responses findings reveals risk must be any risk. Its influence is evident failure meet budgets. This finding points factor considered when preparing managing project, even more during early stages examining transaction, prior acceptance. present examined hypotheses, using chi-square tests independence, goodness-of-fit tests, loglinear Poisson regression analyses fluctuation charts. We found low percentage levels are associated budget exception perception exception. No association was between schedule, performance.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

THE IMPLEMENTATION OF PROJECTS WITHIN BUDGET AND SCHEDULE. Dr.Ted Moore* and Professor

The implementation of projects within budget and schedule performance criteria is generally considered as “could be improved”. Why some projects might not achieve their objectives within pre-set parameters or achieve them at an unacceptable cost, is an issue that is constantly being evaluated. This paper describes the development of a model of 4 internal phases that may affect project teams dur...

متن کامل

Schedule Multiple Highway Construction Projects

The scheduling of numerous construction projects considering several factors is an important challenge faced by construction companies, particularly road builders. Road builders need to make decision to identify the best possible schedule to complete multiple constructions while considering multiple factor such as maximizing profit, reducing risk, and resource constraints among many other factors.

متن کامل

Ants Can Schedule Software Projects

This paper presents the design of an algorithm based on Ant Colony Optimization paradigm to solve the Software Project Scheduling Problem. This problem consists in deciding who does what during the software project development, finding an optimal schedule for a project so that the precedence and resource constraints are satisfied and the final project cost and its duration are minimized. We pre...

متن کامل

Tradeoffs in Design-to-Budget Projects

The possible tradeoffs depend upon different criteria (e.g. system availability, operational risk), whose relative importance is in turn imposed by the mission characteristics (e.g. recurring satellite routine operations, human spaceflight, LEOP). A methodology, issued from the optimization field, is first defined in order to evaluate the impact of these tradeoffs on the considered criteria. Th...

متن کامل

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2022

ISSN: ['2071-1050']

DOI: https://doi.org/10.3390/su141811184