Numerical study of the Martelange mine to be used as underground reservoir for constructing an Underground Pumped Storage Hydropower plant

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Chilean underground mine dataset

This article presents a robotic dataset collected from the largest underground copper mine in the world. The sensor measurements from a 3D scanning lidar, a 2D radar, and stereo cameras were recorded from an approximately two kilometer traverse of a production-active tunnel. The equipment used and the data collection process is discussed in detail, along with the format of the data. This datase...

متن کامل

The Numerical Simulation for air distribution of an Underground Main Workshop in Hydropower Station

ABSTRCT: Use CFD method to study of the air distribution of certain practical project. By using three-dimensional RNG k-εturbulent model, the air distribution of an underground main workshop in hydropower station with heat source at non-isothermal condition has been designed by means of numerical simulation. Solve the controlling equations by using the soft ware of computational fluid dynamics ...

متن کامل

Simulating Development in an Underground Hardrock Mine

System simulation is an increasingly popular technique for analyzing and improving existing as well as newly designed underground mining operations. An engineering firm that specializes in simulation helped a major metals producer build a long-range planning model of an existing underground mine. Subsequently the team adapted this model to assess technology alternatives in the design of a new m...

متن کامل

Automatic 3D Underground Mine Mapping

For several years, our research group has been developing methods for automated modeling of 3D environments. In September, 2002, we were given the opportunity to demonstrate our mapping capability in an underground coal mine. The opportunity arose as a result of the Quecreek mine accident, in which an inaccurate map caused miners to breach an abandoned, water-filled mine, trapping them for seve...

متن کامل

Constrained Path Optimisation for Underground Mine Layout

The major infrastructure component required to develop an underground mine is a decline, which is a system of tunnels used for access and haulage. In this paper we study the problem of designing a decline of minimum cost where cost is a combination of development and haulage costs over the life of the mine. A key design consideration is that the decline must be navigable to trucks and mining eq...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Advances in Geosciences

سال: 2018

ISSN: 1680-7359

DOI: 10.5194/adgeo-45-51-2018