Note—On the Deterministic Demand Multi-Product Single-Machine Lot Scheduling Problem
نویسندگان
چکیده
منابع مشابه
A Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes
In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem. Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...
متن کاملAn Extension of the Multi-machine Multi-level Proportional Lot Sizing and Scheduling Model for Product-Life-Cycle Demand
Often lot sizing and scheduling models have neglected the consideration of influence of product life cycles (PLCs). But, accordingly as desirable in a firm’s production strategy, decisions of lot sizing scheduling may have to respond to the stage changes in a product’s life cycle. In this paper, we propose an extension of the lot sizing scheduling, the multi-item, multi-level product-structure...
متن کاملOptimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time
In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...
متن کاملa mathematical programming model and genetic algorithm for a multi-product single machine scheduling problem with rework processes
in this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. we concern rework in the scheduling environment and propose a mixed-integer programming (mip) model for the problem. based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...
متن کاملOn Multi-product Lot-Sizing and Scheduling with Multi-machine Technologies
We consider a problem of multi-product lot-sizing and scheduling where each product can be produced by a family of alternative multi-machine technologies. Multi-machine technologies require one or more machine at the same time. A sequence dependent setup time is needed between different technologies. The criterion is to minimize the makespan. Preemptive and non-preemptive versions of the proble...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Management Science
سال: 1979
ISSN: 0025-1909,1526-5501
DOI: 10.1287/mnsc.25.3.276