Note on minimax distribution free procedure for integrated inventory model with defective goods and stochastic lead time demand
نویسندگان
چکیده
منابع مشابه
Note on minimax distribution free procedure for integrated inventory model with defective goods and stochastic lead time demand
This note is a response to a paper of Ho that was published in Information and Management Sciences, 20 (2009), 161–171. We find two reasonable criteria to insure the existence and uniqueness of the optimal solution. Based on the same numerical examples, if we directly compare our results with that by Ho, then the improvement is about 30%. Meanwhile, after revising the computation errors, then o...
متن کاملAn Integrated Inventory Model with Controllable Lead time and Setup Cost Reduction for Defective and Non-Defective Items
In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...
متن کاملan integrated inventory model with controllable lead time and setup cost reduction for defective and non-defective items
in this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. the cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. lead time is an important element in any inventory system. the proposed model is presents an integrated inventory model with controllable lead tim...
متن کاملAn Integrated Supply Chain Inventory Model with Imperfect-quality Items, Controllable Lead Time and Distribution-free Demand
In this paper, we consider an integrated vendor-buyer inventory policy for a continuous review model with a random number of defective items and screening process gradually at a fixed screening rate in buyer’s arriving order lot. We assume that shortages are allowed and partially backlogged on the buyer’s side, and that the lead time demand distribution is unknown, except its first two moments....
متن کاملAn integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production
In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Mathematical Modelling
سال: 2011
ISSN: 0307-904X
DOI: 10.1016/j.apm.2010.11.034