منابع مشابه
Solving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملSingle Hoist Scheduling in No-Wait Flexible Flow Shop System
This paper studies the single hoist scheduling problem in no-wait flexible flow shop system with constant process times. The objective is to minimize the make span in the given job tasks. Different jobs have different process routes and process times. When a job starts, workstation must be free to process the job, and as soon as it is finished, the hoist must be free to move it to the next work...
متن کاملA heuristic for no-wait flow shop scheduling
This paper presents an efficient heuristic method to minimize total flow time in no-wait flow shop scheduling. It is based on the assumption that the priority of a job in the initial sequence is given by the sum of its processing times on the bottleneck machines. Empirical results demonstrate the superiority of the proposed method over the best-known heuristics in the literature, while remainin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Revista Internacional de Métodos Numéricos para Cálculo y Diseño en Ingeniería
سال: 2021
ISSN: 0213-1315,1886-158X
DOI: 10.23967/j.rimni.2021.04.005