New stochastic linear programming approximations for network capacity control problem with buy-ups

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Method for Solving the Fully Interval Bilevel Linear Programming Problem with Equal Constraints

Most research on bilevel linear programming problem  is focused on its deterministic form, in which the coefficients and decision variables in the objective functions and constraints are assumed to be crisp. In fact, due to inaccurate information, it is difficult to know exactly values of coefficients that used to construct a bilevel model. The interval set theory is suitable for describing and...

متن کامل

A Suggested Approach for Stochastic Interval-Valued Linear Fractional Programming problem

In this paper, we considered a Stochastic Interval-Valued Linear Fractional Programming problem(SIVLFP). In this problem, the coefficients and scalars in the objective function are fractional-interval, and technological coefficients and the quantities on the right side of the constraints were random variables with the specific distribution. Here we changed a Stochastic Interval-Valued Fractiona...

متن کامل

Stable LInear Approximations to Dynamic Programming for Stochastic Control Problems with Local Transitions

We consider the solution to large stochastic control problems by means of methods that rely on compact representations and a variant of the value iteration algorithm to compute approximate costto-go functions. While such methods are known to be unstable in general, we identify a new class of problems for which convergence, as well as graceful error bounds, are guaranteed. This class involves li...

متن کامل

Dynamic Programming Approximations for a Stochastic Inventory Routing Problem

This work is motivated by the need to solve the inventory routing problem when implementing a business practice called vendor managed inventory replenishment (VMI). With VMI, vendors monitor their customers’ inventories, and decide when and how much inventory should be replenished at each customer. The inventory routing problem attempts to coordinate inventory replenishment and transportation i...

متن کامل

a new type-ii fuzzy logic based controller for non-linear dynamical systems with application to 3-psp parallel robot

abstract type-ii fuzzy logic has shown its superiority over traditional fuzzy logic when dealing with uncertainty. type-ii fuzzy logic controllers are however newer and more promising approaches that have been recently applied to various fields due to their significant contribution especially when the noise (as an important instance of uncertainty) emerges. during the design of type- i fuz...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Revenue and Pricing Management

سال: 2007

ISSN: 1476-6930,1477-657X

DOI: 10.1057/palgrave.rpm.5160125