New modified exponentially weighted moving average-moving average control chart for process monitoring
نویسندگان
چکیده
The mixed control chart is proposed to improve detection performance with fewer process shifts. In this study, we the modified exponentially weighted moving average - (MMEM), a new for observing changes in mean. Average run length, standard deviation of and median length can be used examine effectiveness detecting Shewhart, Moving (MA), Modified Exponentially Weighted (MEWMA), Mixed (MMME) charts parametric nonparametric distributions that use Monte Carlo simulation. results demonstrate outperforms other mostly small-to-moderate To illustrate application chart, chemical temperature data dataset on survival times group patients suffering from head neck cancer disease treated radiotherapy were provided, it was discovered performs better than charts.
منابع مشابه
Multivariate Exponentially Weighted Moving Average Chart for Monitoring Poisson Observations∗
In many practical situations, multiple variables often need to be monitored simultaneously to ensure the process is in control. In this article, we develop a feasible multivariate monitoring procedure based on the general Multivariate Exponentially Weighted Moving Average (MEWMA) to monitor the multivariate count data. The multivariate count data is modeled using Poisson-Lognormal distribution ...
متن کاملA new exponentially weighted moving average control chart for monitoring the coefficient of variation
Monitoring coefficient of variation is one of the successful approaches to Statistical Process Control (SPC) when the process mean and standard deviation are not constants. This paper presents a modified Exponentially Weighted Moving Average (EWMA) chart in order to further enhance the sensitivity of the EWMA control chart proposed by Castagliola et al. (2011). Tables are provided for the stati...
متن کاملDesign of Exponentially Weighted Moving Average Chart for Monitoring Standardized Process Variance
Control charts for monitoring of process variance are developed based on Shewhart, exponentially weighted moving average (EWMA) and cumulative sum (CUSUM) control charts for mean. In all these variance control charts, log transformation of the sample variance is used. The design procedure of this chart is complex and it is poorly understood by the industry. In this paper a EWMA chart for monito...
متن کاملAverage Run Length Performance for Multivariate Exponentially Weighted Moving Average Control Chart Procedure with Application
The drawbacks to multivariate charting schemes is their inability to identify which variable was the source of the signal. The multivariate exponentially weighted moving average (MEWMA) developed by Lowry, et al (1992) is an example of a multivariate charting scheme whose monitoring statistic is unable to determine which variable caused the signal. In this paper, the run length performance of m...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Connection science
سال: 2022
ISSN: ['0954-0091', '1360-0494']
DOI: https://doi.org/10.1080/09540091.2022.2090513