منابع مشابه
Estonian Genome Project - before the take-off and take-off
I will give an overview of the preparations of the EGP including all aspects of the project and current satus of the pilot phase, describe the informatics part of the project together with other aspects (legal, ethical, logistics, financial etc.) and where we stand in terms of population genetics and genotyping technology in order to start using the sample collection for case--control studies f...
متن کاملCut-off Sampling Design: Take all, Take Some, and Take None
Extended Abstract. Sampling is the process of selecting units (e.g., people, organizations) from a population of interest so that by studying the sample we may fairly generalize our results back to the population from which they were chosen. To draw a sample from the underlying population, a variety of sampling methods can be employed, individually or in combination. Cut-off sampling is a pr...
متن کاملEdge-tenacity in Networks
Numerous networks as, for example, road networks, electrical networks and communication networks can be modeled by a graph. Many attempts have been made to determine how well such a network is "connected" or stated differently how much effort is required to break down communication in the system between at least some nodes. Two well-known measures that indicate how "reliable" a graph is are the...
متن کاملTake - off Tests on a Transport Aircraft Including the use of a ' SCAT ' Take - off Director
A large number of takeoff tests have been made on a Comet aircraft with the object of (a) acquiring comprehensive data on undirected takeoffs ; (b) testing a SCAT takeoff director. SCAT is explained in detail and the aircraft installation and test method described. Tests to determine ground effect on lift and on the SCAT Lift Transducer are also described. Undirected and directed takeoffs are c...
متن کاملDesign of Off-Street Parking Facilities
The decision whether a parking garage will be attractive, profitable and will operate efficiently, or whether it will be unsatisfactory to the point of being an unprofitable venture, often is made when the parking facility is in the design stage. This is particularly true of parking garages of the self-parking type. On behalf of the Building Planning Service of the National Associ ation of Bui...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Nature Electronics
سال: 2019
ISSN: 2520-1131
DOI: 10.1038/s41928-018-0199-5