NETWORK METHOD USING CONNECTING RATIO IN CONSTRUCTION SCHEDULING
نویسندگان
چکیده
منابع مشابه
Scheduling in Container Terminals using Network Simplex Algorithm
In static scheduling problem, where there is no change in situation, the challenge is that the large problems can be solved in a short time. In this paper, the Static Scheduling problem of Automated Guided Vehicles in container terminal is solved by the Network Simplex Algorithm (NSA). The algorithm is based on graph model and their performances are at least 100 times faster than traditional si...
متن کاملA Heuristic using GOSST with 2 Connecting Strategies for Minimum Construction Cost of Network
The goal of this research is to devise a heuristic to solve the GOSST(Grade of Services Steiner Minimum Tree) problem that could apply to the design of communication networks. GOSST problem is to find a network topology satisfying the G-condition with minimum construction cost. The proposed heuristic might provide a way to design of more economical network offering differential grade of service...
متن کاملImproving Spectrum Efficiency by Cognitive Radio Network Using Scheduling Method
Recent studies show that the fixed spectrum assignment policy enforced today results in poor spectrum utilization. To address this problem, the concept of cognitive radio is proposed to address the issue of spectrum efficiency and has been receiving an increasing attention in recent years, since it equips wireless users the capability to optimally adapt their operating parameters according to t...
متن کاملscheduling in container terminals using network simplex algorithm
in static scheduling problem, where there is no change in situation, the challenge is that the large problems can be solved in a short time. in this paper, the static scheduling problem of automated guided vehicles in container terminal is solved by the network simplex algorithm (nsa). the algorithm is based on graph model and their performances are at least 100 times faster than traditional si...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Architecture and Planning (Transactions of AIJ)
سال: 2001
ISSN: 1340-4210,1881-8161
DOI: 10.3130/aija.66.161_1